Altuwaim, A and El-Rayes, K (2018) Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost. Journal of Construction Engineering and Management, 144(07).

Hasanzadeh, S, Esmaeili, B and Dodd, M D (2018) Examining the Relationship between Construction Workers’ Visual Attention and Situation Awareness under Fall and Tripping Hazard Conditions: Using Mobile Eye Tracking. Journal of Construction Engineering and Management, 144(07).

Hosseini, M R, Martek, I, Chileshe, N, Zavadskas, E K and Arashpour, M (2018) Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: “Big Five Theory” Perspective. Journal of Construction Engineering and Management, 144(07).

Hwang, S, Jebelli, H, Choi, B, Choi, M and Lee, S (2018) Measuring Workers’ Emotional State during Construction Tasks Using Wearable EEG. Journal of Construction Engineering and Management, 144(07).

Jordan Srour, F, Kiomjian, D and Srour, I M (2018) Automating the Use of Learning Curve Models in Construction Task Duration Estimates. Journal of Construction Engineering and Management, 144(07).

Karakhan, A A, Rajendran, S, Gambatese, J and Nnaji, C (2018) Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach. Journal of Construction Engineering and Management, 144(07).

Karimi, H, Taylor, T R B, Dadi, G B, Goodrum, P M and Srinivasan, C (2018) Impact of Skilled Labor Availability on Construction Project Cost Performance. Journal of Construction Engineering and Management, 144(07).

Konstantinou, E and Brilakis, I (2018) Matching Construction Workers across Views for Automated 3D Vision Tracking On-Site. Journal of Construction Engineering and Management, 144(07).

Lee, C Y, Chong, H and Wang, X (2018) Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. Journal of Construction Engineering and Management, 144(07).

Liu, J and Lu, M (2018) Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. Journal of Construction Engineering and Management, 144(07).

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid Genetic Algorithm and Linear Programming for Bulldozer Emissions and Fuel-Consumption Management Using Continuously Variable Transmission. Journal of Construction Engineering and Management, 144(07).

Mirzaei, A, Nasirzadeh, F, Parchami Jalal, M and Zamani, Y (2018) 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. Journal of Construction Engineering and Management, 144(07).

Sankaran, B and O’Brien, W J (2018) Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects. Journal of Construction Engineering and Management, 144(07).

Swei, O (2018) Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics. Journal of Construction Engineering and Management, 144(07).

Trinh, M T, Feng, Y and Jin, X (2018) Conceptual Model for Developing Resilient Safety Culture in the Construction Environment. Journal of Construction Engineering and Management, 144(07).